PRODUCT
Polyurea (Hybrid Coating)
CREA-45
Two component hybrid polyurea elastomer system(PUU)
Description
CREA-45 is a two component hybrid poly-urea elastomer system((PUU) with high performance.
This system is based on polyether resins, amine chain extenders and prepolymers.
It provides an extremely flexible, tough, resilient monolithic membrane with good water resistance.
Uses
  • Corrosion protection
  • Waterproofing
  • Abrasion resistance
  • Decorative & Aesthetics
Typical Properties
Part Viscositys / 25℃ SP.GR / 25℃
A Component 400 ~ 800 1.13 ± 0.03
B(color) Component 400 ~ 800 1.03 ± 0.03
Physical Properties
Item Spec.
Hardness (Shore A) 83 ± 5
Tensile Strength (N/mm2) 17 ± 5
Elongation (%) 500 ± 100
Tear Strength (N/mm) 60 ± 30
Drying Time
  • T.F.T. : < 15sec.
  • Full Service Use : > 72 hrs / 20℃
    (To attain the final physical properties should be two weeks later)
Installation equipment
  • GRACO H-XP2, H-XP3, H-20/35, GAMA G-250H
  • Spray Gun : GX-7 DI, GAMA Star GUN
  • AIR : over 0.7MPa Dry Air
Process Condition
  • Dispense pressure : > 2,000psi (Dynamic)
  • Differential Pressure : < 300psi (A and B Dynamic)
  • Spray Width : 40 ~ 80°
  • Main heater Temperature : 70℃(±5℃)
  • Hose heater Temperature : 70℃(±5℃)
  • Component Temperature : 35 ~ 55℃
  • Mixing ratio (V/V) : 1:1
  • Theoretical coverage ratio : 1.1Kg/m2
  • Recommended Coating Thickness : 2 ~ 3mm
  • One Layer Thickness : 300 ~ 800㎛
  • Spray gun Swing Range : <120cm
  • Recoat time : <24hrs(20℃).

    If over the recoat time, use thin coat of the primer before spraying main coat.

  • Top Coat

    To prevent peeling the 'top coat' in the water park application, 'TOP Coat' should be spread within 1 day after 'Main Coat' is sprayed.

    If over the time, use thin coat of the primer.

Construction Specification (20℃)
  • Concrete /Primer / Joint Sealant / CREA-45

    - Spread 'SL-60' within 4~ 48hrs after primer applying

    - Spray 'CREA-45' within 12~48hrs after 'Joint Sealant' applying

  • Steel / Primer / CREA-45

    - Spray 'EPL-550' within 4~24hrs after primer applying

    - Steel should be treated by Sandblast (SA-2.5 or SSPC-SP-10)

Limitation
  • Apply when ambient temperature +5 ℃ ~ 35 ℃
  • Surface temperature must be at least +3 ℃ above dew point
  • Relative humidity must be less than 85%
  • Need preheating of A, B Component to 35~55℃
  • Recommend using ‘Drum heating and’ for preheating.
  • Need to mix well the toner in B Component. Somepart of the toner may be settled down to bottom.
Packing Unit
  • A Component : 220 kg / Drum
  • B Component : 200 kg / Drum
   
Storage Stability
  • 12month (5 ~ 35℃ indoor)
Comparison Photos (Before & After)

Before

After

Before

After

Before

After